|
Dec 26, 2024
|
|
|
|
CM 3430: Construction Estimating for Development 3 Credit Hours
Prerequisite: CM 3410 A study of quantity take-off techniques and equipment productivity analysis necessary to development. Small scale development project budgeting will be analyzed from the developer viewpoint. Initial conceptual design budget is based on square foot or assembly pricing for the various construction systems and detailed estimate for the infrastructure costs including site work and utilities. Indirect costs associated with zoning, local codes, and ordinances, as well as soft cost associated with design and engineering will be discussed.
Add to Portfolio (opens a new window)
|
|